Office Refurbishment in Dubai & Abu Dhabi

When your lease renews or your team outgrows the layout, refurbishing can give you a new office without the cost of moving. Our refurbishment works range from a quick refresh of finishes to a full office renovation with new partitions, ceilings and MEP.

We plan every office renovation in phases, with noisy work after hours, so your team keeps working. Approvals, MEP upgrades and handover are handled by the same in-house team that delivers our turnkey fit outs.

Refurbished open-plan office with hanging planters
500+PROJECTS
Phasedso your team keeps working
2-16 weeksfrom refresh to full renovation
All approvalslandlord, municipality, Civil Defence
ISO 45001safe sites next to live offices
Refurbishment options

Office Renovation Options

Three levels of office refurbishment, from a quick refresh to a full renovation.

RefreshFinishes onlyPartial refurbishmentSelected zonesFull renovationStrip out and rebuild
Typical scopePaint, carpet, lighting fixtures, signageReception, meeting rooms or pantry reworkedNew layout, partitions, ceilings, MEP and finishes
Layout changeNoneSomeFull
ApprovalsLandlord permissionLandlord NOC, possibly authoritiesLandlord NOC and authority permits
Can staff stay in?YesYes, with phasingYes, with phasing, or temporary move
Typical duration2-4 weeks4-8 weeks8-16 weeks
Best forTired finishes, brand updateFixing problem areasLease renewal, growth or merger
Refurbishment services

Office Refurbishment Services

Renovation services for offices in Dubai and Abu Dhabi.

Working around your team

How We Refurbish a Working Office

The measures that let your staff keep working while we renovate.

Phased zones

By floor area

The office is split into zones. Teams move as each zone is finished.

After-hours work

Evenings, weekends

Noisy, dusty and disruptive tasks are scheduled outside working hours.

Dust and noise control

Every phase

Sealed dust screens, protected routes and quieter tools in occupied areas.

Safe routes

Every day

Separate access for workers and materials, agreed with building management.

IT continuity

Planned

Network and server moves planned with your IT team to avoid downtime.

Daily clean-up

Every shift

Working areas cleaned and handed back before your staff arrive.

Refurbishment process

Office Refurbishment Process

Five stages from the first survey to the last zone handed back.

  1. 01

    Survey

    Week 1

    We survey the office, the existing MEP and the furniture worth keeping, and review the landlord's rules.

    • Condition survey
    • Existing drawings check
    • Furniture reuse list
  2. 02

    Design

    Weeks 1-4

    New layout and finishes with 3D visuals, and a phasing plan that keeps your team working.

    • Layout and 3D
    • Phasing plan
    • Fixed price
  3. 03

    Approvals

    Weeks 3-6

    Landlord NOC and authority permits where partitions, ceilings or MEP change.

    • Landlord NOC
    • Authority approvals
  4. 04

    Phased works

    2-16 weeks

    Each zone built, inspected and handed back before the next starts.

    • Zone handovers
    • Weekly reports
    • HSE audits
  5. 05

    Handover

    Final week

    Final snagging, completion certificates and updated as-built drawings.

    • Completion certificates
    • As-built drawings
    • O&M manuals
Permits and approvals

Renovation Approvals We Handle

Changes to partitions, ceilings, AC, lighting or fire systems need approval before work starts.

Dubai

Mainland and free-zone offices

  • Landlord and building NOCFit-out approval from building management before any submission.
  • Dubai MunicipalityFit-out permit for mainland offices.
  • Dubai Civil DefenceFire and life safety drawings, inspection and completion.
  • DEWAElectrical load changes and connections.
  • Free-zone authoritiesDDA, DMCC, DIFC, Trakhees and others, each with its own guidelines.

Abu Dhabi

Mainland and free-zone offices

  • Landlord and building NOCApproval of layouts and contractor access.
  • Municipality building permitFit-out permit through the Department of Municipalities and Transport.
  • Abu Dhabi Civil DefenceFire and life safety approval and final inspection.
  • Utility providerElectrical load and connection approvals.
  • Free-zone authoritiesADGM, Masdar City, KEZAD and others where applicable.
Why Winteriors

Why Choose Us for Office Refurbishment

Minimal disruption

Phasing and after-hours work are planned from the start, not added later. Most of our refurbishment clients keep working throughout the project.

Refurbished office corridor with glass partitions

Refurbish or relocate, answered with facts

We can test fit your team in your current office and in a new building, with cost ranges for both, so the decision is based on numbers.

Renovated double-height open office

Safe, certified sites

Working next to occupied offices needs strict safety. Our ISO 45001 certified procedures cover dust, noise, fire safety and access every day.

Renovated boardroom with timber cladding
ISO 9001 QualityISO 14001 EnvironmentISO 45001 Health & Safety500+ projects delivered
Case studies

Office Projects We Have Delivered

Gulf Tech boardroom, Abu DhabiOffices

Gulf Tech

Abu Dhabi, UAE · 600 SQM
All Energy Services office, DubaiOffices

All Energy Services (AES)

Dubai, UAE · 450 SQM
Ben's Cookies store, DubaiRetail

Ben's Cookies

Dubai, UAE · 120 SQM
Gulf Tech boardroom with timber wall cladding and linear lighting
Case study

Gulf Tech Headquarters

Abu Dhabi, UAE · 600 SQM · Executive finish
The brief
A headquarters that could host clients and board meetings while giving a growing team room to work.
What we delivered
A boardroom with full-height timber cladding, a feature ceiling with concealed linear lighting and integrated AV, alongside open workstations and glass-fronted cabins.
The result
A single floor that works for daily operations and for the company's most important meetings.
FAQs

Office Renovation FAQs

Can you refurbish our office while staff keep working?

Yes. We split the office into phases, move teams within the floor as each zone is finished, and schedule noisy, dusty or disruptive work after hours and at weekends, within building rules. Dust screens, clean routes and daily cleaning keep working areas usable.

How long does an office renovation take?

A light refresh can be done in 2-4 weeks. A partial refurbishment of selected zones usually takes 4-8 weeks, and a full renovation 8-16 weeks depending on size, phasing and approvals.

Do office renovations need approvals in Dubai and Abu Dhabi?

Most do. Painting and carpet replacement usually only need landlord permission, but changes to partitions, ceilings, lighting, AC or fire systems need landlord NOC and authority approvals such as Dubai Municipality and Civil Defence, or the municipality and Civil Defence in Abu Dhabi. We prepare and manage these for you.

How much does an office renovation cost?

It depends on how much changes. A refresh of finishes costs far less than a full renovation with new MEP. For full renovations, our office fit out rates from AED 2,500 per sqm (Budget), AED 3,500 (Executive) and AED 6,000 (Premium) are a useful upper guide. We confirm the price after a site survey.

Should we refurbish or relocate?

Refurbishing avoids moving costs, a new lease and a second deposit, and keeps your address. Relocating makes sense when the space no longer fits your headcount or the building limits what you can do. We can test fit your team in both scenarios so you can compare.

Can you reuse our existing furniture?

Often, yes. We survey what you have, plan the new layout around pieces worth keeping and tell your supplier what needs replacing. We do not supply furniture ourselves.

Consultation

Get an Office Renovation Quote

  1. Tell us about your space. Size, location, team and the package you are considering.
  2. Free site visit. A designer measures the space and talks through your brief.
  3. Layout and proposal. You receive a first layout and a detailed cost proposal.